Agenda item

Response to consultation by Esso on the location of a new pipeline

Minutes:

The Executive considered a draft response to a consultation on a replacement pipeline between Southampton and London, which passed through the borough.  

 

Objections had been raised in the draft letter in respect of a sub option which would route the pipeline corridor in close proximity to the Frimley District Centre and Frimley Park Hospital, owing to the possible significant disruption associated with this routing.  No objections or concerns had been raised in respect of pipeline corridor options that do not pass through the Borough.

 

RESOLVED to agree the response set out at Annex 1 to the agenda report as the Council’s formal response to the Southampton to London Pipeline Project’s replacement pipeline corridor consultation.

 

 

Supporting documents: